Press Release

Press Release

 CONTROL TECHNIQUES GIVES TRAIN A LIFT

One of the most powerful lifting systems in the world has been installed by the SNCF at its new “East European Technicentre”.  A synchronized lifting line can lift a complete TGV train-set – some 200 metres long and weighing 386 tonnes – in just 10 minutes to an accuracy of a millimetre, thus allowing maintenance of the running gear.

This represents a world record in terms of the accuracy / volume / weight ratio and was achieved with the use of Control Techniques Unidrive SP AC drives in conjunction with LSMV asynchronous brake-motors from sister company Leroy-Somer, who was responsible for leading the project.

The new Technicentre, located on the outskirts of Paris, is the maintenance headquarters for the TGV Est, which links Paris to 21 cities in eastern France as well as 11 other destinations in Germany, Luxembourg and Switzerland.  Journey times have been drastically reduced – Paris Strasbourg, for example, is reduced from four hours to just two hours 20 minutes.

There are a total of 26 jacking stands fitted along the maintenance line, each fitted with an 11kW Unidrive SP drive, incorporating three plug-in modules; SM Applications module to give powerful on-board programming, SM Interbus for drive to drive synchronization and communications and an SM Universal Encoder module for position feedback from the jacks.  The Leroy-Somer LSMV motors were provided with absolute encoders for accurate positioning and fitted with brakes for security.>>>>>>>

To read this release in full download the word document by clicking on the Word icon above

 

Click here to return to Press Releases

word download icon
Click on the Word icon above to download the full press release
 
Cick on the thumbnail below to download the high resolution image
TGV Train Lift
TGV Train Lift
TGV Train Lift